Processing and solarPhotovoltaic solar energy laying cable p

(1) A metal cable pipe should not have perforations, cracks, severe corrosion significantly uneven and so on, the pipe wall should be smooth and without glitches. After the cable pipe bending should not have cracks or significantly dented phenomenon, the degree of bend pipe diameter of not more than 10%, the nozzle should be made of horn or polished.
(2) The cable tube diameter of not less than 1.5 times the cable diameter, bend radius should be consistent with the provisions of penetration of cable bend radius. Each cable should not be more than three pipe elbow. Not more than two right angles.
(3) Connecting cable pipe shall meet the following requirements:
a, metal pipes should adopt large short tube socket level, short tube weld ends sealed with a threaded connection time, the connection sealed.
b, metal pipe at the socket or plug, the insertion depth of not less than 1.1 to 1.8 times the diameter, the docking surfaces should be coated with glue cement seal. When using sockets, casing welding ends should be sealed in order to ensure a secure seal.
c, thin-walled steel welded connection is strictly prohibited.
(4) When the thin-walled steel pipe for the cable should be coated with anti-corrosion paint (inside concrete buried pipe may not be painted); When using galvanized pipes, galvanized layer is peeled position should also be coated with anti-corrosion paint.
(5) Lead to the cable pipe outlet location devices should be easy device connection and without prejudice to dismantling and access. Parallel cable laying pipe mouth should be arranged in neat rows.
(6) The protective tube for the grounding wire when use of the cable, the ground wire should be welded well, then the laying of cables. There are threaded pipe joints, should be soldered jumpers.
(7) Pipe into the box (box) To straight, in box (box) within the exposed length equal to or less than 5 mm, with locking nut of the tube, the tube is exposed thread locknut 2 to 4 buckles .

Preparation and installation of cable tray:
(1) Cable tray and accessories should be properly stored and custody, should not cause deformation and damage, and should be product certification.
(2) Cable trays should be installed firmly, smooth vertical and horizontal, the vertical deviation should not be greater than the length of 2/1000, the level of error should not be larger than the width of 2/1000.
(3) Cable bridge in the live production of non-standard parts and welding, must be painted anticorrosive primer, paint should be uniform and complete color consistency.
Prev:None     Next:None
成人A片产无码免费视频奶头| 久久人人妻人人做人人爽| 少妇做爰特黄A片免费看| 无码国精品一区二区免费| 极品粉嫩小泬白浆20PA片| 久久无码AV中文出轨人妻| 从书房一路做到阳台| 小婷的性放荡日记H| 人妻AV无码一区二区三区| 人妻少妇无码精品视频区| 日韩精品人妻系列无码AV东京| 69久久国产露脸精品国产| 亚洲HAIRY多毛PICS大全| 日本免费一区二区三区高清视频 | 成熟女人优雅涵养说说| 亚洲AV无码精品色午夜| 国产三级农村妇女系列| 久久久国产精华液2023| 国产AV无遮挡喷水白浆桃花视频| 成人家庭影院| 国产精品久久一区二区三区| 中国男男自慰gay片免费观看| 处破女处破全过程| 饥渴少妇A片AAA毛片小说| 我和亲妺婷婷在浴室作爱经过| 亲胸揉屁股膜下刺激视频| 男人猛躁进女人的毛片A片| 人妻夜夜添夜夜无码AV| 强 暴 疼 哭 处 女| 扒开老女毛荫荫的黑森林视频 | 亚洲欧美乱综合图片区小说区| SM鞭打高潮喷水抽搐调教玩弄| 国内揄拍国内精品人妻试看| 中文字幕亚洲乱码熟女在线萌芽| 色综合久久中文字幕无码| 学长别揉了~流水了想要~| 精品一区二区久久久久久久网站 | 久久久国产精华液2023| 中文字幕日韩一区二区三区不卡| 亚洲熟妇色XXXXX欧美老妇Y| 一本色道久久综合狠狠躁|